Case Studies

Case Study: Wind Farm Unlocks $430,000 in Annual Revenue

Written by WindESCo | Apr 11, 2024 7:52:25 PM

WindESCo helps Longroad Energy unlock $430,000 in annual revenue from acquired wind plant

In 2018, WindESCo was engaged by Longroad Energy to optimize the performance of a recently acquired 145 MW wind farm.

WindESCo worked closely with the project owner to increase the value of their investment by improving annual plant revenue by $3,000/MW or $430,000 per year.

 
Download this case study to learn:
  • Our approach to increasing plant output and its relevance for M&A transactions
  • Why projects continue to lose revenue to yaw misalignment and how we correct it
  • How pitch settings affect output and how we help optimize them
  • Anomalies detected by WindESCo's AI-based algorithms
  • How we worked with Longroad's engineering and site team to fix these issues
  • How our partnership with Longroad increased the value of their project