Case Study: Wind Farm Unlocks $430,000 in Annual Revenue

Case Study: Wind Farm Unlocks $430,000 in Annual Revenue

WindESCo helps Longroad Energy unlock $430,000 in annual revenue from acquired wind plant

In 2018, WindESCo was engaged by Longroad Energy to optimize the performance of a recently acquired 145 MW wind farm.

WindESCo worked closely with the project owner to increase the value of their investment by improving annual plant revenue by $3,000/MW or $430,000 per year.

 
Download this case study to learn:
  • Our approach to increasing plant output and its relevance for M&A transactions
  • Why projects continue to lose revenue to yaw misalignment and how we correct it
  • How pitch settings affect output and how we help optimize them
  • Anomalies detected by WindESCo's AI-based algorithms
  • How we worked with Longroad's engineering and site team to fix these issues
  • How our partnership with Longroad increased the value of their project

 

 

Whitepaper: Are Power Curve Upgrades Worth It?

Whitepaper: Are Power Curve Upgrades Worth It?

Measuring the ROI for Power Curve Upgrades In this whitepaper, we provide our insights about what considerations you need to make to accurately...

Read More
Case Study: Improving AEP of Assets Under OEM Service Contract

Case Study: Improving AEP of Assets Under OEM Service Contract

Unlocking the Performance of Assets Under LTSA with WindESCo Greencoat engaged WindESCo to help improve the performance of assets under contract with...

Read More
Whitepaper: Ultimate Guide to Yaw Misalignment

Whitepaper: Ultimate Guide to Yaw Misalignment

The Invisible Issue Affecting Your Wind Plant Revenue Yaw misalignment decreases operating margins for wind plants around the world. Is your project...

Read More