Case Study: Improving AEP of Assets Under OEM Service Contract

Case Study: Improving AEP of Assets Under OEM Service Contract

Unlocking the Performance of Assets Under LTSA with WindESCo

Greencoat engaged WindESCo to help improve the performance of assets under contract with the OEM. Assets under contract are often considered off-limits to external AEP improvement programs. In this case, WindESCo shows how collaborating with an OEM can effectively increase plant performance within a long term service agreement. 


 
Download this case study to learn how WindESCo:
  • Identified performance issues through a data-only solution
  • Worked with the asset manager and OEM to fix the problem
  • Validated the changes made through the OEM's 2nd generation solution
  • Increased AEP site-wide to improve margins

 

Case Study: Wind Plant Increases Annual Revenue by $5,700/MW

Case Study: Wind Plant Increases Annual Revenue by $5,700/MW

How did this wind plant increase its annual revenue? WindESCo was engaged by UPC Renewables to optimize 79 MW of in-warranty turbines under an OEM...

Read More
Case Study: Wind Farm Unlocks $430,000 in Annual Revenue

Case Study: Wind Farm Unlocks $430,000 in Annual Revenue

WindESCo helps Longroad Energy unlock $430,000 in annual revenue from acquired wind plant In 2018, WindESCo was engaged by Longroad Energy to...

Read More
Whitepaper: Innovation's Role in the Next Stage of Wind Energy Growth

Whitepaper: Innovation's Role in the Next Stage of Wind Energy Growth

Without innovation, meeting net zero goals by 2050 will be nearly impossible. In Madrid in July 2022, WindESCo and A Word About Wind brought together...

Read More